Introduction
The Voltix GSC-M is an air-cooled C&I energy storage cabinet with a rated capacity of 241 kWh. It integrates battery management, active cell balancing, forced-air cooling, and optional whole-cabinet fire suppression, making it suitable for factories, commercial buildings, offices, and microgrid applications.
Technical Specifications
|
Parameter |
Specification |
|
Rated / Usable Energy |
241 kWh (1P240S, 768 V × 314 Ah) / ~217 kWh usable @ 90% DoD |
|
Rated PCS Power |
100 / 125 kW continuous; 150 kW peak (≤30 min) |
|
System Voltage |
768 V (672–864 V) |
|
Battery Cell |
Grade A LiFePO4, 3.2V / 314Ah |
|
Cycle Life |
≥6,000 cycles @ 90% DoD, 0.5C/0.5C, 25°C, to 70% SOH |
|
Operating Temperature |
Charge: 0–45°C / Discharge: −20–55°C (power derating above 45°C) |
|
AC Output |
400V AC ±10%, 3-Phase, 50/60 Hz |
|
Cooling |
Forced-air, internal thermal management |
|
AC Round-Trip Efficiency |
≥88% at 0.5C, 25°C (including PCS) |
|
Auxiliary Consumption |
Standby ≤250 W |
|
Acoustic Noise |
≤75 dB(A) at 1 m |
|
Ambient Conditions |
−20°C to +50°C; ≤2,000 m altitude; 5–95% RH non-condensing |
|
Dimensions |
1,300 × 1,200 × 2,200 mm |
|
Weight |
Approx. 2,450 kg |
|
Protection Rating |
IP54 (indoor or sheltered installation; outdoor use requires a canopy or IP55 option) |
|
Corrosion Class |
C3 (coastal C5 optional) |
|
Parallel Operation |
Up to 10 cabinets on one AC bus |
|
Warranty |
5 years |
BMS Protection & Battery Safety
Voltage Protection: Instantaneous protection against cell overvoltage and undervoltage.
Current & Circuit Protection: High-speed protection against string overcurrent and hard short circuits.
Insulation Monitoring: Continuous DC insulation monitoring relative to ground.
Arc-Fault Detection: DC arc-fault detection trips main contactors upon detecting sustained arcing events.
Fault Logging: Non-volatile memory logs historic events, timestamps, and error codes.
Fire Protection & Thermal Safety
Detection: Multi-sensor arrays monitor smoke concentration, localized thermal spikes, and off-gas emissions.
Suppression: Perfluorohexanone or an aerosol agent is discharged into sealed battery rack compartments upon signal trigger.
High-Voltage Isolation: Trips main DC contactors and closes mechanical ventilation dampers upon fire signal detection.
Pressure Relief: Roof structure incorporates directional pressure-relief venting doors for safe gas exit.
Grid Integration
Grid Connection Modes: Grid-tied and off-grid operational modes with islanding transition transfer times under 20 ms when paired with compatible switches.
Black Start Capability: Integrated control logic supports black start execution to rebuild localized grid voltage using battery power during outages.
Energy Management Interfaces
Supported Field Protocols: Native support for Modbus RTU, Modbus TCP, and CAN profiles.
Telemetry Data Access: Outputs real-time string voltage, current, active fault codes, cell-level min/max voltages, temperatures, SOC, and SOH.
SCADA & EMS Interoperability: Standard register maps allow direct integration with facility SCADA networks and third-party EMS platforms.
Local HMI: Cabinet front door includes a 7-inch industrial touchscreen for parameter setup and active alarm resets.
Remote Gateway: Optional 4G cellular gateway enables remote telemetry access and automated email alerts.
Certifications & Compliance
Factory Management Standards
- ISO 9001: Quality Management System
- ISO 14001: Environmental Management System
Product Compliance & Safety Standards
- UN 38.3: Transport Safety Testing for Lithium Batteries
- IEC 62619: Industrial Lithium Battery Safety Requirements
- CE Mark: EU Safety & EMC Directives
- RoHS: Restriction of Hazardous Substances
- UL 1973: Standard for Batteries in Stationary Applications
- UL 9540A: Test Method for Evaluating Thermal Runaway Fire Propagation
Complete test reports and certificate documentation are available upon request.
FAQ
Q: Can the 241 kWh cabinet be supplied for pilot projects?
A: Yes. It can be supplied as a single cabinet or configured in multiple units on a common AC bus. Quantities depend on the site load profile.
Q: What is the production lead time?
A: Standard units require 8–12 weeks after order confirmation and technical approval. Custom PCS, EMS, communications, or enclosure designs may take longer.
Q: Can the PCS and EMS be customized?
A: Yes, subject to technical compatibility. Interfaces and protection requirements must be confirmed before production.
Q: What technical documents are available?
A: Qualified B2B customers can receive datasheets, wiring and communication documents, certifications, and relevant test reports. Project-specific documents can be finalized before production or FAT.
Q: How are warranty spare parts handled?
A: Critical spare parts and recommended lists are provided according to the system configuration, warranty terms, project quantity, and operating environment.
Q: Can it integrate with third-party EMS or SCADA systems?
A: Yes. Modbus TCP, Modbus RTU, and CAN interfaces are supported. Register mapping and data points are confirmed during engineering.
Q: What overseas installation support is available?
A: Remote support is available for installation, wiring, commissioning, and communications. On-site support can be arranged separately.
Q: What information is needed for a quotation?
A: Please provide the site country, grid voltage and frequency, peak load, daily load profile, operating mode, PV capacity, backup loads, cabinet quantity, and installation environment.
Hot Tags: 241kwh commercial energy storage cabinet | air-cooled lifepo4 battery system c&i, China 241kwh commercial energy storage cabinet | air-cooled lifepo4 battery system c&i manufacturers, suppliers, factory

